13-4-5. Final plat stage application .
(1) The applicant or authorized representative shall submit a final
plat with all required fees and copies of all materials to the department
of engineering to start the final plat stage. When it is determined
that all of the corrections to infrastructure design, engineering
drawings, and, if needed, a new cost estimate of off-site infrastructure
improvements from the predesign meeting are made and these items are
determined to be complete and correct, staff determines that the application
is complete, and all signatures are on the plat, the application shall
be placed on the planning commission public meeting agenda. The final
plat shall conform in all major respects to the approved design stage
plat. A final plat submittal shall not be accepted more than six months
from the date of the design and engineering stage approval or approved
extension.
(2) The final plat stage application shall include:
(a) the application form;
(b) an original 24" X 36" Mylar of the final plat;
(c) a cost estimate for construction of infrastructure, approved and
signed by the county engineer;
(d) an agreement for subdivision improvements;
(e) eight 8½" X 11" copies of the final plat for
distribution to each planning commission member;
(f) any unpaid fees owed to Tooele County for development of land, code
enforcement, or building permits; and
(g) the final plat submitted on a computer disk in a format compatible
with AutoCAD version 11 or later.
(3) All signature blocks except for the planning commission's block
shall be signed by the appropriate authority before the plat is taken
to the public meeting.
(4) Should the planning commission's decision be to approve the plat,
the chair shall then sign the plat. If approved, the improvement agreements
and bonds shall be forwarded with a recommendation from the planning
commission to the county commission. The plat shall be recorded within
30 days or it shall be void. (Ref UCA §17-27a-103, 17-27a-207,
17-27a-603, 17-27a-604, Ord.2005-21, 09/6/05) |