13-5-7. Final plat stage application .
(1) The applicant or authorized representative shall submit a final
plat and copies of all required material to the department of engineering
to start the final plat stage. When all corrections to infrastructure
design, engineering drawings, and, if needed, a new cost estimate
of off-site infrastructure improvements from the predesign meeting
are made and these items are determined to be complete and correct,
and all signatures are on the plat, the application shall be placed
on the planning commission agenda. The final plat shall conform in
all major respects to the approved design stage plat. A final plat
submittal shall not be accepted more than one year from the date of
the design stage approval.
(2) An application shall include:
(a) an application form;
(b) an original 24" X 36" Mylar of the final plat;
(c) cost estimate for construction of infrastructure signed by the county
engineer;
(d) agreement for subdivision improvements;
(e) eight 8½" X 11" copies of the plat for distribution
to each planning commission member;
(f) any unpaid fees owed to Tooele County for development of land, code
enforcement, or building permits; and
(g) the final plat submitted on a computer disk in a format compatible
with AutoCAD version 11 or later.
(3) All signature blocks except for the planning commission's block
shall be signed by the appropriate approving authority before the
plat is taken to the business meeting.
(4) Should the planning commission's decision be to approve the plat,
the chair shall then sign the plat. If approved, the improvement agreements
and bonds shall be forwarded with a recommendation from the planning
commission to the county commission. The plat shall be recorded within
30 days or it shall be void. (Ord.2005-21, 09/6/05)
|