 |
6-13-12. License application.
(1) Application for a license to hold an assembly shall be made at least
60 days in advance of such assembly in writing upon a form supplied
by the department of engineering, which shall contain the following
information:
(a) a signed statement made upon oath or affirmation that the statements
contained therein are true and correct to the best knowledge of the
applicant;
(b) the name, age, date of birth, business license number, residence
and mailing address of the applicant, company or corporation sponsoring
the assembly;
(c) the address and legal description of all property upon which the
assembly is to be held, together with the name, residence and mailing
address of the record owner(s) of all such property;
(d) proof of ownership of all property upon which the assembly is
to be held or a statement made upon oath or affirmation by the record
owner(s) of all such property that the applicant has permission to
use such property for the assembly;
(e) the nature or purpose of the assembly;
(f) the dates and hours during which the assembly is to last;
(g) the maximum number of persons the applicant shall permit to assemble
at any time, not to exceed the maximum number which can reasonably
gather at the location, in consideration of the nature of the assembly,
or the maximum number of persons allowed to sleep within the boundaries
of the location of the assembly by the zoning ordinances of Tooele
County if the assembly is to continue overnight;
(h) the maximum number of tickets to be sold and the ticket outlets
where they will be sold and marketed;
(i) plans to limit the maximum number of people permitted to assemble;
(j) plans for fencing the assembly location and the gates contained
in such fence;
(k) plans for providing toilet and lavatory facilities, including
the source, number, location, type and the means of disposing of waste
deposited;
(l) plans for holding, collecting and disposing of solid waste;
(m) plans, if any, to illuminate the location of the assembly, including
the source and amount of power and the location of lamps;
(n) plans for emergency first aid care;
(o) plans for parking vehicles, including size and location of lots,
points of highway access and interior roads, and routes between highway
access and parking lots;
(p) plans for camping facilities, if any, including facilities available
and their location;
(q) plans for security, including the number of guards, their deployment,
and their names, addresses, credentials and hours of availability;
(r) plans for fire protection, including the number, type and location
of all protective devices, alarms and extinguishers, and the number
of emergency fire personnel available to operate the equipment; and
(s) plans for food concessions and concessionaires who will be allowed
to operate on the grounds, including the names and addresses of all
concessionaires and their license or permit number.
(t) a plat map from the recorder’s office showing all adjoining
property owners within one mile of the property where the assemble
is being proposed along with a list of the names and addresses of
all those landowners appearing on the tax rolls of Tooele County.
(2) The application shall be accompanied by the bond required and
the license fee. (Ord. 03-12, 6/10/03; Ord. 95-19, 9/12/95; Ord 92-5,
9/1/92)
|
 |
|